{"id":3302,"date":"2022-10-27T10:30:45","date_gmt":"2022-10-27T10:30:45","guid":{"rendered":"https:\/\/p69.com.vn\/?p=3302"},"modified":"2023-02-03T03:28:52","modified_gmt":"2023-02-03T03:28:52","slug":"thi-cong-dien-nuoc-trong-cong-trinh","status":"publish","type":"post","link":"https:\/\/p69.com.vn\/en\/thi-cong-dien-nuoc-trong-cong-trinh\/","title":{"rendered":"Technical construction of electricity and water in standard civil works"},"content":{"rendered":"<p><span style=\"vertical-align: inherit;\">Before we want to build a project such as a school, office, company, etc., we need to go through the design and implementation of electricity and water construction. Therefore, this is an extremely important step that cannot be missed when you want to implement a project. In today&#8217;s article, <\/span><a href=\"https:\/\/p69.com.vn\/\" target=\"_blank\" rel=\"noopener\"><strong><span style=\"vertical-align: inherit;\">P69 company<\/span><\/strong><\/a><span style=\"vertical-align: inherit;\"> will introduce to you the electrical and water construction techniques in standard civil works that you may be interested in.<\/span><\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_45 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\">Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" area-label=\"ez-toc-toggle-icon-1\"><label for=\"item-69d35c44e38f7\" aria-label=\"Table of Content\"><span style=\"display: flex;align-items: center;width: 35px;height: 30px;justify-content: center;direction:ltr;\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/label><input  type=\"checkbox\" id=\"item-69d35c44e38f7\"><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 eztoc-visibility-hide-by-default' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/p69.com.vn\/en\/thi-cong-dien-nuoc-trong-cong-trinh\/#Why_should_the_correct_technique_be_followed_when_constructing_electricity_and_water_in_the_project\" title=\"Why should the correct technique be followed when constructing electricity and water in the project?\">Why should the correct technique be followed when constructing electricity and water in the project?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/p69.com.vn\/en\/thi-cong-dien-nuoc-trong-cong-trinh\/#Principles_to_keep_in_mind_when_constructing_electricity_and_water_in_civil_works\" title=\"Principles to keep in mind when constructing electricity and water in civil works\">Principles to keep in mind when constructing electricity and water in civil works<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/p69.com.vn\/en\/thi-cong-dien-nuoc-trong-cong-trinh\/#Electrical_construction_process_in_civil_works\" title=\"Electrical construction process in civil works\">Electrical construction process in civil works<\/a><ul class='ez-toc-list-level-3'><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/p69.com.vn\/en\/thi-cong-dien-nuoc-trong-cong-trinh\/#Step_1_Install_the_power_line_protection_pipe_system\" title=\"Step 1: Install the power line protection pipe system\">Step 1: Install the power line protection pipe system<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/p69.com.vn\/en\/thi-cong-dien-nuoc-trong-cong-trinh\/#Step_2_Install_the_power_cable\" title=\"Step 2: Install the power cable\">Step 2: Install the power cable<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/p69.com.vn\/en\/thi-cong-dien-nuoc-trong-cong-trinh\/#Step_3_Install_electrical_cabinets_and_panels\" title=\"Step 3: Install electrical cabinets and panels\">Step 3: Install electrical cabinets and panels<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/p69.com.vn\/en\/thi-cong-dien-nuoc-trong-cong-trinh\/#Step_4_Install_electrical_equipment\" title=\"Step 4: Install electrical equipment\">Step 4: Install electrical equipment<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/p69.com.vn\/en\/thi-cong-dien-nuoc-trong-cong-trinh\/#Step_5_Perform_connector_work_check\" title=\"Step 5: Perform connector work, check\">Step 5: Perform connector work, check<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/p69.com.vn\/en\/thi-cong-dien-nuoc-trong-cong-trinh\/#Step_1_Construction_of_the_refrigeration_system\" title=\"Step 1: Construction of the refrigeration system\">Step 1: Construction of the refrigeration system<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/p69.com.vn\/en\/thi-cong-dien-nuoc-trong-cong-trinh\/#Step_2_Construction_of_communication_and_fire_alarm_system\" title=\"Step 2: Construction of communication and fire alarm system\">Step 2: Construction of communication and fire alarm system<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/p69.com.vn\/en\/thi-cong-dien-nuoc-trong-cong-trinh\/#Step_3_Construction_of_lightning_protection_system\" title=\"Step 3: Construction of lightning protection system\">Step 3: Construction of lightning protection system<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/p69.com.vn\/en\/thi-cong-dien-nuoc-trong-cong-trinh\/#Measures_to_ensure_safety_during_construction\" title=\"Measures to ensure safety during construction\">Measures to ensure safety during construction<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/p69.com.vn\/en\/thi-cong-dien-nuoc-trong-cong-trinh\/#Quotation_for_electricity_and_water_construction_according_to_m2\" title=\"Quotation for electricity and water construction according to m2:\">Quotation for electricity and water construction according to m2:<\/a><ul class='ez-toc-list-level-3'><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/p69.com.vn\/en\/thi-cong-dien-nuoc-trong-cong-trinh\/#1_Quotation_for_office_electricity_and_water_construction\" title=\"1. Quotation for office electricity and water construction\">1. Quotation for office electricity and water construction<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/p69.com.vn\/en\/thi-cong-dien-nuoc-trong-cong-trinh\/#2_Quotation_for_construction_of_electricity_and_water_at_home\" title=\"2. Quotation for construction of electricity and water at home\">2. Quotation for construction of electricity and water at home<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/p69.com.vn\/en\/thi-cong-dien-nuoc-trong-cong-trinh\/#Contact_information_P69_-_M_E_M_E_Contractor\" title=\"Contact information P69 \u2013 M&amp;E . M&amp;E Contractor\">Contact information P69 \u2013 M&amp;E . M&amp;E Contractor<\/a><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"Why_should_the_correct_technique_be_followed_when_constructing_electricity_and_water_in_the_project\"><\/span><span style=\"vertical-align: inherit;\">Why should the correct technique be followed when constructing electricity and water in the project?<\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"vertical-align: inherit;\">Many people believe that in the construction, only electricity and running water are enough. It is not necessary to care about the correct installation technique. This is a completely wrong concept because the risk with the project is extremely large. This can even be life-threatening. In fact, in Vietnam, there have been many fatal electric shock leaks, which are directly caused by improper installation of electrical systems that are not safe.<\/span><\/p>\n<figure id=\"attachment_3311\" aria-describedby=\"caption-attachment-3311\" style=\"width: 650px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-3311 size-full\" title=\"Why should the correct technique be followed when constructing electricity and water in the project?\" src=\"https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/10\/hinh-anh-thi-cong-mang-1.jpg\" alt=\"Why should the correct technique be followed when constructing electricity and water in the project?\" width=\"650\" height=\"242\" srcset=\"https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/10\/hinh-anh-thi-cong-mang-1.jpg 650w, https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/10\/hinh-anh-thi-cong-mang-1-300x112.jpg 300w, https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/10\/hinh-anh-thi-cong-mang-1-600x223.jpg 600w\" sizes=\"auto, (max-width: 650px) 100vw, 650px\" \/><figcaption id=\"caption-attachment-3311\" class=\"wp-caption-text\"><em><span style=\"vertical-align: inherit;\">Why should the correct technique be followed when constructing electricity and water in the project?<\/span><\/em><\/figcaption><\/figure>\n<p><span style=\"vertical-align: inherit;\">You must have experienced a clogged drain. In the course of more than 10 years of construction and maintenance of the water and electricity system, we found that 90% of the causes of clogged pipes are installation errors. Only 10% errors due to the use process only.<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">Therefore, the correct implementation of electrical and water construction techniques is a mandatory requirement to avoid unwanted problems later in the process of use.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Principles_to_keep_in_mind_when_constructing_electricity_and_water_in_civil_works\"><\/span><span style=\"vertical-align: inherit;\">Principles to keep in mind when constructing electricity and water in civil works<\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"vertical-align: inherit;\">&#8211; Use a low voltage tester or a light bulb to determine the current. It is strictly forbidden to use hands to test, which will cause danger to the user.<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">&#8211; In case of broken electricity located above the galvanometer, the electricity branch must be notified to send workers to repair. If the damaged part is behind the galvanometer, it is imperative to cut the main circuit breaker before proceeding to repair the damage.<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">&#8211; It is necessary to ensure that the distance between 2 porcelain clamps or 2 adjacent porcelain pulleys is not too large, besides make sure the distance between the conductor and the structure is not less than 10 mm.<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">&#8211; Construction of electrical conductor connection needs to be staggered and has insulation tape wrapped outside the connection, especially for the case of double wire.<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">&#8211; Never close or cut circuit breakers, switches, etc. When your hands are still wet, it will transmit electricity, causing people to be electrocuted.<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">&#8211; Only electrical equipment and electrical tools that have been grounded and connected without safety protection are allowed.<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">&#8211; Construction and installation of circuit breakers, electrical switches on small wooden boards, and fasten them to walls or columns. The most reasonable place to mount the wooden board is about 1.5 m above the ground. Pay attention to the circuit breaker, the electrical switch must have a safety cover.<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">&#8211; The main lines in the house and each auxiliary line or electrical appliances in the house must have a protective fuse with a safety cover. The fuse-link of the protective fuse must be suitable for the use capacity to ensure that when there is a short-circuit, the fuse-link must explode and cut the circuit. The fuse-link must be installed according to the technical requirements. In a single-phase circuit, it is mandatory to put a fuse on the hot wire. If both wires are hot wires (2 phase wires), you must put fuses on both wires.<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">&#8211; The electrical conductors in the house must not use bare conductors but must use insulated conductors of reputable quality. It is necessary to select the electrical conductor cross-section in accordance with the ability to carry current to the power tools that it provides, to avoid the case of using a conductor with a small cross-section on power tools with too large capacity to avoid causing damage. serious electrical problems.<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">&#8211; When conducting indoor wiring installation, it is necessary to place it on clamps, porcelain pulleys or electrical conduit, which is usually made of plastic.<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">&#8211; Make sure that the electrical wires through the walls and roof need to be placed in protective porcelain pipes. Avoid rain water standing in pipes or running down the house. The distance from the insulators supporting the end of the electrical conductor entering the house to the roof needs to be 2m or more.<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">&#8211; The installation location of circuit breakers and switches must be easy to disassemble, there are obstacles below, the place must be spacious and well-ventilated, ensuring that the closing and cutting of electricity is quick and timely.<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">&#8211; Avoid installing electrical outlets, electrical switches, do not pull power cords through wet places, toilets or bathrooms. For the bathroom, the safest place to place the power switch is on the outside of the room door, next to the door frame on the side without hinges.<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">&#8211; In case the circuit breaker, switch, and electrical outlet is damaged, it must be installed new or replaced immediately to ensure safety for human health.<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">&#8211; It is especially necessary to educate children to understand and not to put metal wires, iron nails or put fingers into electrical sockets.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Electrical_construction_process_in_civil_works\"><\/span><span style=\"vertical-align: inherit;\">Electrical construction process in civil works<\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"vertical-align: inherit;\">Let&#8217;s find out the process and methods of construction of electromechanical systems for offices and families first. In this section, we will go into depth and focus on the construction of electricity and water. In the electrical part, the construction team will proceed step by step in the following order:<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"Step_1_Install_the_power_line_protection_pipe_system\"><\/span><span style=\"vertical-align: inherit;\">Step 1: Install the power line protection pipe system<\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"vertical-align: inherit;\">During the installation of the power line protection system, you should pay attention to strictly follow the agreed standards and design guidelines.<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">In the current designs, architects often follow Vietnamese standards, IEC standards. This protective tube shall be flexible, high temperature resistant, impact resistant and readily malleable.<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">Usually, we put wall pipes and concrete floors. In areas of technical floors, pipes run floating on technical floors. The installation process is as follows:<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">&#8211; The pipe system placed in the concrete floor is implemented right after the construction unit finishes weaving the floor iron layer: In places where there is only one layer of floor iron, the pipe will be placed right on the iron layer, in a position with two layers. iron floor, pipe will be placed between two layers of iron floor. At the turns, these pipes will be bent by springs, the radius is about 6 to 9 times the pipe diameter, ensuring that we can easily pull the wire and replace it later if something goes wrong.<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">&#8211; Absolutely do not use the connectors at the turns: because it will directly affect the pulling of the rope due to the sharp turn. At splits of 3 or more wire branches should be made in boxes.<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">&#8211; The pipes waiting for the wire to be pulled must be covered: to avoid foreign objects entering and having difficulty in pulling the rope later.<\/span><\/p>\n<p><strong><span style=\"vertical-align: inherit;\">Note:<\/span><\/strong><\/p>\n<ul>\n<li><span style=\"vertical-align: inherit;\">When installing underground pipes: it is recommended to install and repair the wall when building the wall 5 days, so that the wall is sufficiently rigid, not cracked when punching the wall, and should only be chiseled after cutting the wall. In places where pipe cutting and splicing is required, the cutter head should be smoothed to avoid scratching the wire. The distance between the two joints is &gt;50mm compared to the middle of the pipe and &gt;25mm at the end of the pipe. Should be fixed by cement or concrete after being fixed by horizontal steel bar or steel wire column.<\/span><\/li>\n<li><span style=\"vertical-align: inherit;\">Pipes floating on technical floors, in technical boxes: must be fixed by hose clamps and the distance between clamps should be &gt;1200mm. Drill the screws and spacers to attach the hose clamp with an electric drill.<\/span><\/li>\n<li><span style=\"vertical-align: inherit;\">Standard for underground electrical conduit: the pipe going in the wall should go in parallel, with the last part being a box containing switches and sockets. Fix the tube to the box with a screw coupling, the recessed light box in the floor needs to be stuffed with paper, foam and covered with masking tape, to prevent the mortar from entering. The connection pipe must be &gt;7mm from the formwork, to avoid cracking bare crow&#8217;s feet.<\/span><\/li>\n<li><span style=\"vertical-align: inherit;\">Use the water scale to determine the position and elevation for the light box, switch box: make sure the boxes after installation are not tilted or skewed.<\/span><\/li>\n<\/ul>\n<figure id=\"attachment_3312\" aria-describedby=\"caption-attachment-3312\" style=\"width: 534px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-3312 size-full\" title=\"Electrical construction process in civil works\" src=\"https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/10\/thi-cong-dien-nuoc-dan-dung-534x400-1.jpg\" alt=\"Electrical construction process in civil works\" width=\"534\" height=\"400\" srcset=\"https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/10\/thi-cong-dien-nuoc-dan-dung-534x400-1.jpg 534w, https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/10\/thi-cong-dien-nuoc-dan-dung-534x400-1-300x225.jpg 300w\" sizes=\"auto, (max-width: 534px) 100vw, 534px\" \/><figcaption id=\"caption-attachment-3312\" class=\"wp-caption-text\"><em><span style=\"vertical-align: inherit;\">Electrical construction process in civil works<\/span><\/em><\/figcaption><\/figure>\n<h3><span class=\"ez-toc-section\" id=\"Step_2_Install_the_power_cable\"><\/span><span style=\"vertical-align: inherit;\">Step 2: Install the power cable<\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"vertical-align: inherit;\">Immediately after completing the installation of the pipe system and junction box, the next step is to install the cable. This stage is very important, so it should be done carefully with a team of skilled workers to ensure that the wiring is simple to install, easy to repair and replace. Otherwise, the repair later will be extremely difficult and complicated.<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">Besides, you also need to note a few details:<\/span><\/p>\n<ul>\n<li><span style=\"vertical-align: inherit;\">The number of wires should only be &lt; 40% of the pipe cross section: This makes it easier to replace later. The wires should be distributed in the right area, in the correct color scheme in the design.<\/span><\/li>\n<li><span style=\"vertical-align: inherit;\">Install wires in the correct order and position in the diagram of electrical distribution cabinets: Connections should be made in plug boxes or light tray boxes. No wiring in the conduit, avoiding electrical problems such as short circuits, and making it easy to repair or replace.<\/span><\/li>\n<li><span style=\"vertical-align: inherit;\">Standard connector cable: has a diameter suitable to the wire cross-section, the power cable connects to the equipment. These connections must ensure the insulation of the whole system, do not overlap on the cross-sections, the distance of the wires is reasonable, do not cause entanglement, the insulation resistance must meet the requirements according to TCVN.<\/span><\/li>\n<li><span style=\"vertical-align: inherit;\">Cable lines must be sure: underground cables must have a minimum depth of 800mm, threaded in PVC pipes with protected concrete, the density of wires in pipes and troughs must be &lt;40% for good heat dissipation and not affected. affected by the traffic above.<\/span><\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"Step_3_Install_electrical_cabinets_and_panels\"><\/span><span style=\"vertical-align: inherit;\">Step 3: Install electrical cabinets and panels<\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"vertical-align: inherit;\">Electrical cabinets and panels are usually cabinets with pedestals and can be mounted on the wall. The installation of these cabinets and panels must be coordinated with the construction work, right before the completion of the wall, because at this time we can determine the position of the iron bars and switches to install the cabinets.<\/span><\/p>\n<ul>\n<li><span style=\"vertical-align: inherit;\">Fix the nameplates of the branches coming out of the cabinet: for easy inspection and maintenance later.<\/span><\/li>\n<li><span style=\"vertical-align: inherit;\">The equipment inside the cabinet: must be installed by a team of skilled workers. Dimensions and details of the equipment inside will be handed over to the investor in the drawings for them to carry out production and installation as well as to consult and supervise the construction later. The cabinet will be designed and installed in accordance with regulations and meet IEC standards.<\/span><\/li>\n<li><span style=\"vertical-align: inherit;\">Time to install cabinets: right after finishing the first coat of water paint.<\/span><\/li>\n<li><span style=\"vertical-align: inherit;\">Ground wire: is spread from the position of the distribution cabinet to the grounding pole. The grounding pile system is installed right after the ground leveling is completed, meeting the resistance measurements specified in the design and regulations.<\/span><\/li>\n<li><span style=\"vertical-align: inherit;\">Use cable reinforcement for connection: after the cabinet and the electrical panel are put into the connection position between the ground wire and the grounded busbar.<\/span><\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"Step_4_Install_electrical_equipment\"><\/span><span style=\"vertical-align: inherit;\">Step 4: Install electrical equipment<\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"vertical-align: inherit;\">Devices that use electricity here include:<\/span><\/p>\n<ul>\n<li><span style=\"vertical-align: inherit;\">Wiring, ap-to-mat, switch: must ensure the right quality and type required in the design and according to the requirements of the investor.<\/span><\/li>\n<li><span style=\"vertical-align: inherit;\">Lights, switches, sockets: are installed after pulling the wire and the paintwork has been completed.<\/span><\/li>\n<li><span style=\"vertical-align: inherit;\">A team of technicians is installing electrical equipment<\/span><\/li>\n<li><span style=\"vertical-align: inherit;\">Technician is installing electrical equipment<\/span><\/li>\n<li><span style=\"vertical-align: inherit;\">Wiring system and electrical equipment: installation principles comply with technical regulations, regularly check and compare with design drawings to coordinate on schedule with construction.<\/span><\/li>\n<li><span style=\"vertical-align: inherit;\">Location of electrical boxes, waiting boxes: must be installed correctly in both position and height, in the right route and must have certainty. The terminals of the waiting line must have a distinguishing mark to avoid confusion.<\/span><\/li>\n<li><span style=\"vertical-align: inherit;\">Conduct electrical testing, and system operation: as soon as all electrical equipment is installed, if not satisfactory, check and correct it in time before handing over to put into use.<\/span><\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"Step_5_Perform_connector_work_check\"><\/span><span style=\"vertical-align: inherit;\">Step 5: Perform connector work, check<\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"vertical-align: inherit;\">The work of connection, inspection and acceptance needs to be done by a team of skilled workers with high technical level. Some points to pay attention to carefully carry out the acceptance test:<\/span><\/p>\n<ul>\n<li><span style=\"vertical-align: inherit;\">Cable terminations are terminated: right before installation in the connection point of the equipment, the cable ends must be terminated, except for the case of connection point structure at the equipment with small capacity.<\/span><\/li>\n<li><span style=\"vertical-align: inherit;\">Before making connection: must carefully check the connection diagram, the voltage used of the equipment described in the catalog or on the label.<\/span><\/li>\n<li><span style=\"vertical-align: inherit;\">Attach device codes: for junction boxes, lights, fans, air conditioners, light rods, light poles, etc., to facilitate later inspection and maintenance.<\/span><\/li>\n<\/ul>\n<h2><\/h2>\n<p><span style=\"vertical-align: inherit;\">After having in hand the drawing of construction methods for the water supply pipe, we will proceed to other tasks in sequence such as:<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"Step_1_Construction_of_the_refrigeration_system\"><\/span><span style=\"vertical-align: inherit;\">Step 1: Construction of the refrigeration system<\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li><span style=\"vertical-align: inherit;\">Refrigerant pipes going underground or floating: must be insulated with thickness &gt;19mm for steam pipes and &gt;6mm for liquid pipes.<\/span><\/li>\n<li><span style=\"vertical-align: inherit;\">Installation time: right after building the wall 5 days is reasonable.<\/span><\/li>\n<li><span style=\"vertical-align: inherit;\">PVC condensate drain pipe: must be insulated with thickness &gt;13mm, slope 1%.<\/span><\/li>\n<li><span style=\"vertical-align: inherit;\">Openings through floors or walls: must be sealed with waterproof material<\/span><\/li>\n<li><span style=\"vertical-align: inherit;\">Pressure testing of the liquid pipeline: must be carried out carefully before gas is injected. Gas must be pressure tested according to the manufacturer&#8217;s standards.<\/span><\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"Step_2_Construction_of_communication_and_fire_alarm_system\"><\/span><span style=\"vertical-align: inherit;\">Step 2: Construction of communication and fire alarm system<\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li><span style=\"vertical-align: inherit;\">Construction at the same time: hidden underground pipeline system for fire notification and hidden underground pipe system.<\/span><\/li>\n<li><span style=\"vertical-align: inherit;\">Installation standards: communication cables must be placed in troughs, separate pipes from medium\/low voltage cables with a distance of &gt;0.6m<\/span><\/li>\n<li><span style=\"vertical-align: inherit;\">Connection of communication and fire alarm cables: must be placed in the junction box, and connected by means of connections.<\/span><\/li>\n<li><span style=\"vertical-align: inherit;\">Ground in a single location: with all levels covered.<\/span><\/li>\n<li><span style=\"vertical-align: inherit;\">Installation height: with network socket, fire alarm device according to instructions and meets TCVN.<\/span><\/li>\n<\/ul>\n<figure id=\"attachment_3313\" aria-describedby=\"caption-attachment-3313\" style=\"width: 1036px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-3313 size-full\" title=\"Water construction process in civil works\" src=\"https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/10\/thi-cong-dien-nuoc-1.jpg\" alt=\"Water construction process in civil works\" width=\"1036\" height=\"1036\" srcset=\"https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/10\/thi-cong-dien-nuoc-1.jpg 1036w, https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/10\/thi-cong-dien-nuoc-1-300x300.jpg 300w, https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/10\/thi-cong-dien-nuoc-1-1024x1024.jpg 1024w, https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/10\/thi-cong-dien-nuoc-1-150x150.jpg 150w, https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/10\/thi-cong-dien-nuoc-1-768x768.jpg 768w, https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/10\/thi-cong-dien-nuoc-1-600x600.jpg 600w, https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/10\/thi-cong-dien-nuoc-1-100x100.jpg 100w\" sizes=\"auto, (max-width: 1036px) 100vw, 1036px\" \/><figcaption id=\"caption-attachment-3313\" class=\"wp-caption-text\"><em><span style=\"vertical-align: inherit;\">Water construction process in civil works<\/span><\/em><\/figcaption><\/figure>\n<h3><span class=\"ez-toc-section\" id=\"Step_3_Construction_of_lightning_protection_system\"><\/span><span style=\"vertical-align: inherit;\">Step 3: Construction of lightning protection system<\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li><span style=\"vertical-align: inherit;\">Implementation sequence: lightning rod F16, h=0.5m and grounding pile l63x63x5, l=2.5m driven into the ground by hammer, connected between 30&#215;4 steel plate and grounded piles buried about 0.8m and down-conductor F16, air-termination wire F10, connected to the ground wire from the ground to the roof.<\/span><\/li>\n<li><span style=\"vertical-align: inherit;\">Installation standards: the air-termination wire is placed &gt;8cm from the wire laying surface, connected to the roof frame, wall by turn-on pins, the distance between the turn-on pins is &gt;1m. The F10 lightning conductor is placed on the wall, the column is also fixed with the flip-flops as above.<\/span><\/li>\n<li><span style=\"vertical-align: inherit;\">Lightning conductors and lightning conductors must be painted with anti-rust paint: the ground wire, the grounding pile must be absolutely unpainted.<\/span><\/li>\n<\/ul>\n<h2><span class=\"ez-toc-section\" id=\"Measures_to_ensure_safety_during_construction\"><\/span><span style=\"vertical-align: inherit;\">Measures to ensure safety during construction<\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"vertical-align: inherit;\">&#8211; Electrical equipment such as Aptomat, circuit breaker, switch must be placed in a convenient and safe place to use, with sealed box and signs.<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">&#8211; Electrical equipment and machinery must be grounded for safety and protected against circuit and overload.<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">&#8211; Only electrical workers who have undergone safety training can do electrical work.<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">&#8211; Strictly comply with technical regulations on safety in construction (TCVN 5308-91) with sufficient force and means of fire prevention and fighting.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Quotation_for_electricity_and_water_construction_according_to_m2\"><\/span><span style=\"vertical-align: inherit;\">Quotation for electricity and water construction according to m2:<\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"vertical-align: inherit;\">Are you having water problems? Affect your daily life but you do not have enough expertise and knowledge to repair. Please contact our company immediately for support to solve the problem. Here are the repair prices you can refer to:<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"1_Quotation_for_office_electricity_and_water_construction\"><\/span><span style=\"vertical-align: inherit;\">1. Quotation for office electricity and water construction<\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"vertical-align: inherit;\">In the case of offices, it is usually electrical construction. In order to be able to quote the most accurate price, our company will send someone to survey the current site or technical drawings. The construction cost of the office&#8217;s electrical items will depend on the needs and complexity:<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">&#8211; For the construction of floating electricity, the price will range from 90,000 VND to 150,000 VND\/m2.<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">&#8211; For construction for wall and ceiling electricity, the price will range from 120,000 VND to 150,000 VND.<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"2_Quotation_for_construction_of_electricity_and_water_at_home\"><\/span><span style=\"vertical-align: inherit;\">2. Quotation for construction of electricity and water at home<\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"vertical-align: inherit;\">&#8211; Townhouse: 90,000m2.<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">&#8211; Villa: 120,000m2.<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">Normally, for electricity and water construction, the quotation for electricity and water construction will only include construction labor. For the design, it will depend on the needs of the customer to choose the appropriate equipment.<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">The technical parameters will be provided to you by the construction unit for installation. The construction unit can advise you basically on the most necessary features. For our company, we will give you dedicated and in-depth advice on technical drawings.<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">The design and construction of electricity and water are extremely important to maintain daily life, which is an impossible element in our modern life today for all homes.<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">For equipment that goes underground, you need to check and maintain it regularly because repairing underground passages is very difficult and complicated. So please contact our company immediately to help you fix this problem.<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">Contact us today for a free consultation and answer at:<\/span><\/p>\n<div dir=\"auto\">\n<h2><span class=\"ez-toc-section\" id=\"Contact_information_P69_-_M_E_M_E_Contractor\"><\/span><span id=\"Thong_tin_lien_he_P69_-_Nha_Thau_Co_Dien_M_E\" class=\"ez-toc-section\"><\/span><span id=\"Thong_tin_lien_he_P69_-_Nha_Thau_Co_Dien_M_E\" class=\"ez-toc-section\"><\/span><span id=\"Thong_tin_lien_he_P69_-_Nha_Thau_Co_Dien_M_E\" class=\"ez-toc-section\"><\/span><span id=\"Thong_tin_lien_he_P69_-_Nha_Thau_Co_Dien_M_E\" class=\"ez-toc-section\"><\/span><span id=\"Thong_tin_lien_he_P69_-_Nha_Thau_Co_Dien_M_E\" class=\"ez-toc-section\"><\/span><span id=\"Thong_tin_lien_he_P69_-_Nha_Thau_Co_Dien_M_E\" class=\"ez-toc-section\"><\/span><span id=\"Thong_tin_lien_he_P69_-_Nha_Thau_Co_Dien_M_E\" class=\"ez-toc-section\"><\/span><span id=\"Thong_tin_lien_he_P69_-_Nha_Thau_Co_Dien_M_E\" class=\"ez-toc-section\"><\/span><span id=\"Thong_tin_lien_he_P69_-_Nha_Thau_Co_Dien_M_E\" class=\"ez-toc-section\"><\/span><span id=\"Thong_tin_lien_he_P69_-_Nha_Thau_Co_Dien_M_E\" class=\"ez-toc-section\"><\/span><span id=\"Thong_tin_lien_he_P69_-_Nha_Thau_Co_Dien_M_E\" class=\"ez-toc-section\"><\/span><span id=\"Thong_tin_lien_he_P69_-_Nha_Thau_Co_Dien_M_E\" class=\"ez-toc-section\"><\/span><span id=\"Thong_tin_lien_he_P69_-_Nha_Thau_Co_Dien_M_E\" class=\"ez-toc-section\"><\/span><span id=\"Thong_tin_lien_he_P69_-_Nha_Thau_Co_Dien_M_E\" class=\"ez-toc-section\"><\/span><span id=\"Thong_tin_lien_he_P69_-_Nha_Thau_Co_Dien_M_E\" class=\"ez-toc-section\"><\/span><span id=\"Thong_tin_lien_he_P69_-_Nha_Thau_Co_Dien_M_E\" class=\"ez-toc-section\"><\/span><span id=\"Thong_tin_lien_he_P69_-_Nha_Thau_Co_Dien_M_E\" class=\"ez-toc-section\"><\/span><span id=\"Thong_tin_lien_he_P69_-_Nha_Thau_Co_Dien_M_E\" class=\"ez-toc-section\"><\/span><span id=\"Thong_tin_lien_he_P69_-_Nha_Thau_Co_Dien_M_E\" class=\"ez-toc-section\"><\/span><span id=\"Thong_tin_lien_he_P69_-_Nha_Thau_Co_Dien_M_E\" class=\"ez-toc-section\"><\/span><span id=\"Thong_tin_lien_he_P69_-_Nha_Thau_Co_Dien_M_E\" class=\"ez-toc-section\"><\/span><span id=\"Thong_tin_lien_he_P69_-_Nha_Thau_Co_Dien_M_E\" class=\"ez-toc-section\"><\/span><span id=\"Thong_tin_lien_he_P69_-_Nha_Thau_Co_Dien_M_E\" class=\"ez-toc-section\"><\/span><span id=\"Thong_tin_lien_he_P69_-_Nha_Thau_Co_Dien_M_E\" class=\"ez-toc-section\"><\/span><span id=\"Thong_tin_lien_he_P69_-_Nha_Thau_Co_Dien_M_E\" class=\"ez-toc-section\"><\/span><span id=\"Thong_tin_lien_he_P69_-_Nha_Thau_Co_Dien_M_E\" class=\"ez-toc-section\"><\/span><span id=\"Thong_tin_lien_he_P69_-_Nha_Thau_Co_Dien_M_E\" class=\"ez-toc-section\"><\/span><span style=\"vertical-align: inherit;\">Contact information P69 \u2013 M&amp;E . M&amp;E Contractor<\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"vertical-align: inherit;\">Address: No. 6\/165C Xuan Thuy, Cau Giay District, Hanoi<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">Website: https:\/\/p69.com.vn\/<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">Hotline: 02437688156 \u2013 0965937799<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">Email: kd@cokhip69.com.vn<\/span><\/p>\n<p><span style=\"vertical-align: inherit;\">Facebook:\u00a0 <\/span><a href=\"https:\/\/www.facebook.com\/p69nhathaucodien\" target=\"_blank\" rel=\"nofollow noopener\"><span style=\"vertical-align: inherit;\">https:\/\/www.facebook.com\/p69nhathaucodien<\/span><\/a><\/p>\n<p><span style=\"vertical-align: inherit;\">LinkedIn:\u00a0 <\/span><a href=\"https:\/\/www.linkedin.com\/in\/congtyp69\/\" target=\"_blank\" rel=\"nofollow noopener\"><span style=\"vertical-align: inherit;\">https:\/\/www.linkedin.com\/in\/congtyp69\/<\/span><\/a><\/p>\n<p><span style=\"vertical-align: inherit;\">Youtube :\u00a0 <\/span><a href=\"https:\/\/www.youtube.com\/channel\/UCOUwCnE5iGj8iqe_ZIUM7oA\" target=\"_blank\" rel=\"nofollow noopener\"><span style=\"vertical-align: inherit;\">https:\/\/www.youtube.com\/channel\/UCOUwCnE5iGj8iqe_ZIUM7oA<\/span><\/a><\/p>\n<\/div>\n<p><\/p>\n\n\n<div class=\"kk-star-ratings kksr-auto kksr-align-left kksr-valign-bottom\"\n    data-payload='{&quot;align&quot;:&quot;left&quot;,&quot;id&quot;:&quot;3302&quot;,&quot;slug&quot;:&quot;default&quot;,&quot;valign&quot;:&quot;bottom&quot;,&quot;ignore&quot;:&quot;&quot;,&quot;reference&quot;:&quot;auto&quot;,&quot;class&quot;:&quot;&quot;,&quot;count&quot;:&quot;0&quot;,&quot;legendonly&quot;:&quot;&quot;,&quot;readonly&quot;:&quot;&quot;,&quot;score&quot;:&quot;0&quot;,&quot;starsonly&quot;:&quot;&quot;,&quot;best&quot;:&quot;5&quot;,&quot;gap&quot;:&quot;5&quot;,&quot;greet&quot;:&quot;Rate this post&quot;,&quot;legend&quot;:&quot;0\\\/5 - (0 votes)&quot;,&quot;size&quot;:&quot;24&quot;,&quot;width&quot;:&quot;0&quot;,&quot;_legend&quot;:&quot;{score}\\\/{best} - ({count} {votes})&quot;,&quot;font_factor&quot;:&quot;1.25&quot;}'>\n            \n<div class=\"kksr-stars\">\n    \n<div class=\"kksr-stars-inactive\">\n            <div class=\"kksr-star\" data-star=\"1\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"2\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"3\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"4\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"5\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n    <\/div>\n    \n<div class=\"kksr-stars-active\" style=\"width: 0px;\">\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n    <\/div>\n<\/div>\n                \n\n<div class=\"kksr-legend\" style=\"font-size: 19.2px;\">\n            <span class=\"kksr-muted\">Rate this post<\/span>\n    <\/div>\n    <\/div>","protected":false},"excerpt":{"rendered":"<p>Before we want to build a project such as a school, office, company, etc., we need to go through the design and implementation of electricity and water construction. Therefore, this is an extremely important step that cannot be missed when you want to implement a project. In today&#8217;s article, P69 company will introduce to you [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":3313,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[24],"tags":[],"class_list":["post-3302","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tin-tuc"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v17.1.1 (Yoast SEO v20.0) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>K\u1ef9 thu\u1eadt thi c\u00f4ng \u0111i\u1ec7n n\u01b0\u1edbc trong c\u00f4ng tr\u00ecnh d\u00e2n d\u1ee5ng chu\u1ea9n<\/title>\n<meta name=\"description\" content=\"Khi mu\u1ed1n x\u00e2y d\u1ef1ng m\u1ed9t c\u00f4ng tr\u00ecnh n\u00e0o \u0111\u00f3 th\u00ec ta c\u1ea7n ph\u1ea3i qua kh\u00e2u thi\u1ebft k\u1ebf v\u00e0 th\u1ef1c hi\u1ec7n thi c\u00f4ng \u0111i\u1ec7n n\u01b0\u1edbc. trong c\u00e1c c\u00f4ng tr\u00ecnh\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/p69.com.vn\/thi-cong-dien-nuoc-trong-cong-trinh\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"[:vi]K\u1ef9 thu\u1eadt thi c\u00f4ng \u0111i\u1ec7n n\u01b0\u1edbc trong c\u00f4ng tr\u00ecnh d\u00e2n d\u1ee5ng chu\u1ea9n[:en]Technical construction of electricity and water in standard civil works[:]\" \/>\n<meta property=\"og:description\" content=\"Khi mu\u1ed1n x\u00e2y d\u1ef1ng m\u1ed9t c\u00f4ng tr\u00ecnh n\u00e0o \u0111\u00f3 th\u00ec ta c\u1ea7n ph\u1ea3i qua kh\u00e2u thi\u1ebft k\u1ebf v\u00e0 th\u1ef1c hi\u1ec7n thi c\u00f4ng \u0111i\u1ec7n n\u01b0\u1edbc. trong c\u00e1c c\u00f4ng tr\u00ecnh\" \/>\n<meta property=\"og:url\" content=\"https:\/\/p69.com.vn\/thi-cong-dien-nuoc-trong-cong-trinh\/\" \/>\n<meta property=\"og:site_name\" content=\"P69\" \/>\n<meta property=\"article:published_time\" content=\"2022-10-27T10:30:45+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-02-03T03:28:52+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/10\/thi-cong-dien-nuoc-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1036\" \/>\n\t<meta property=\"og:image:height\" content=\"1036\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"adminhdec\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"adminhdec\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"17 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/p69.com.vn\/thi-cong-dien-nuoc-trong-cong-trinh\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/p69.com.vn\/thi-cong-dien-nuoc-trong-cong-trinh\/\"},\"author\":{\"name\":\"adminhdec\",\"@id\":\"https:\/\/p69.com.vn\/#\/schema\/person\/e7444874c2d9f2d90eb8fbc63e75243f\"},\"headline\":\"Technical construction of electricity and water in standard civil works\",\"datePublished\":\"2022-10-27T10:30:45+00:00\",\"dateModified\":\"2023-02-03T03:28:52+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/p69.com.vn\/thi-cong-dien-nuoc-trong-cong-trinh\/\"},\"wordCount\":8446,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/p69.com.vn\/#organization\"},\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/p69.com.vn\/thi-cong-dien-nuoc-trong-cong-trinh\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/p69.com.vn\/thi-cong-dien-nuoc-trong-cong-trinh\/\",\"url\":\"https:\/\/p69.com.vn\/thi-cong-dien-nuoc-trong-cong-trinh\/\",\"name\":\"K\u1ef9 thu\u1eadt thi c\u00f4ng \u0111i\u1ec7n n\u01b0\u1edbc trong c\u00f4ng tr\u00ecnh d\u00e2n d\u1ee5ng chu\u1ea9n\",\"isPartOf\":{\"@id\":\"https:\/\/p69.com.vn\/#website\"},\"datePublished\":\"2022-10-27T10:30:45+00:00\",\"dateModified\":\"2023-02-03T03:28:52+00:00\",\"description\":\"Khi mu\u1ed1n x\u00e2y d\u1ef1ng m\u1ed9t c\u00f4ng tr\u00ecnh n\u00e0o \u0111\u00f3 th\u00ec ta c\u1ea7n ph\u1ea3i qua kh\u00e2u thi\u1ebft k\u1ebf v\u00e0 th\u1ef1c hi\u1ec7n thi c\u00f4ng \u0111i\u1ec7n n\u01b0\u1edbc. trong c\u00e1c c\u00f4ng tr\u00ecnh\",\"breadcrumb\":{\"@id\":\"https:\/\/p69.com.vn\/thi-cong-dien-nuoc-trong-cong-trinh\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/p69.com.vn\/thi-cong-dien-nuoc-trong-cong-trinh\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/p69.com.vn\/thi-cong-dien-nuoc-trong-cong-trinh\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Trang ch\u1ee7\",\"item\":\"https:\/\/p69.com.vn\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"K\u1ef9 thu\u1eadt thi c\u00f4ng \u0111i\u1ec7n n\u01b0\u1edbc trong c\u00f4ng tr\u00ecnh d\u00e2n d\u1ee5ng chu\u1ea9n\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/p69.com.vn\/#website\",\"url\":\"https:\/\/p69.com.vn\/\",\"name\":\"P69\",\"description\":\"C\u00f4ng ty C\u1ed5 Ph\u1ea7n \u0110\u1ea7u T\u01b0 P69\",\"publisher\":{\"@id\":\"https:\/\/p69.com.vn\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/p69.com.vn\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/p69.com.vn\/#organization\",\"name\":\"P69 - Nh\u00e0 Th\u1ea7u C\u01a1 \u0110i\u1ec7n (M&E) - C\u00f4ng ty C\u1ed5 ph\u1ea7n \u0110\u1ea7u T\u01b0 P69\",\"url\":\"https:\/\/p69.com.vn\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/p69.com.vn\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/01\/log-3.png\",\"contentUrl\":\"https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/01\/log-3.png\",\"width\":80,\"height\":89,\"caption\":\"P69 - Nh\u00e0 Th\u1ea7u C\u01a1 \u0110i\u1ec7n (M&E) - C\u00f4ng ty C\u1ed5 ph\u1ea7n \u0110\u1ea7u T\u01b0 P69\"},\"image\":{\"@id\":\"https:\/\/p69.com.vn\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/p69.com.vn\/#\/schema\/person\/e7444874c2d9f2d90eb8fbc63e75243f\",\"name\":\"adminhdec\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/p69.com.vn\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/6a37fb20c2a6355450f6e88f87712df2c2f3dd263b0e77cec6231c95e507f5b5?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/6a37fb20c2a6355450f6e88f87712df2c2f3dd263b0e77cec6231c95e507f5b5?s=96&d=mm&r=g\",\"caption\":\"adminhdec\"},\"url\":\"https:\/\/p69.com.vn\/en\/author\/adminhdec\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"K\u1ef9 thu\u1eadt thi c\u00f4ng \u0111i\u1ec7n n\u01b0\u1edbc trong c\u00f4ng tr\u00ecnh d\u00e2n d\u1ee5ng chu\u1ea9n","description":"Khi mu\u1ed1n x\u00e2y d\u1ef1ng m\u1ed9t c\u00f4ng tr\u00ecnh n\u00e0o \u0111\u00f3 th\u00ec ta c\u1ea7n ph\u1ea3i qua kh\u00e2u thi\u1ebft k\u1ebf v\u00e0 th\u1ef1c hi\u1ec7n thi c\u00f4ng \u0111i\u1ec7n n\u01b0\u1edbc. trong c\u00e1c c\u00f4ng tr\u00ecnh","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/p69.com.vn\/thi-cong-dien-nuoc-trong-cong-trinh\/","og_locale":"en_US","og_type":"article","og_title":"[:vi]K\u1ef9 thu\u1eadt thi c\u00f4ng \u0111i\u1ec7n n\u01b0\u1edbc trong c\u00f4ng tr\u00ecnh d\u00e2n d\u1ee5ng chu\u1ea9n[:en]Technical construction of electricity and water in standard civil works[:]","og_description":"Khi mu\u1ed1n x\u00e2y d\u1ef1ng m\u1ed9t c\u00f4ng tr\u00ecnh n\u00e0o \u0111\u00f3 th\u00ec ta c\u1ea7n ph\u1ea3i qua kh\u00e2u thi\u1ebft k\u1ebf v\u00e0 th\u1ef1c hi\u1ec7n thi c\u00f4ng \u0111i\u1ec7n n\u01b0\u1edbc. trong c\u00e1c c\u00f4ng tr\u00ecnh","og_url":"https:\/\/p69.com.vn\/thi-cong-dien-nuoc-trong-cong-trinh\/","og_site_name":"P69","article_published_time":"2022-10-27T10:30:45+00:00","article_modified_time":"2023-02-03T03:28:52+00:00","og_image":[{"width":1036,"height":1036,"url":"https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/10\/thi-cong-dien-nuoc-1.jpg","type":"image\/jpeg"}],"author":"adminhdec","twitter_card":"summary_large_image","twitter_misc":{"Written by":"adminhdec","Est. reading time":"17 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/p69.com.vn\/thi-cong-dien-nuoc-trong-cong-trinh\/#article","isPartOf":{"@id":"https:\/\/p69.com.vn\/thi-cong-dien-nuoc-trong-cong-trinh\/"},"author":{"name":"adminhdec","@id":"https:\/\/p69.com.vn\/#\/schema\/person\/e7444874c2d9f2d90eb8fbc63e75243f"},"headline":"Technical construction of electricity and water in standard civil works","datePublished":"2022-10-27T10:30:45+00:00","dateModified":"2023-02-03T03:28:52+00:00","mainEntityOfPage":{"@id":"https:\/\/p69.com.vn\/thi-cong-dien-nuoc-trong-cong-trinh\/"},"wordCount":8446,"commentCount":0,"publisher":{"@id":"https:\/\/p69.com.vn\/#organization"},"articleSection":["News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/p69.com.vn\/thi-cong-dien-nuoc-trong-cong-trinh\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/p69.com.vn\/thi-cong-dien-nuoc-trong-cong-trinh\/","url":"https:\/\/p69.com.vn\/thi-cong-dien-nuoc-trong-cong-trinh\/","name":"K\u1ef9 thu\u1eadt thi c\u00f4ng \u0111i\u1ec7n n\u01b0\u1edbc trong c\u00f4ng tr\u00ecnh d\u00e2n d\u1ee5ng chu\u1ea9n","isPartOf":{"@id":"https:\/\/p69.com.vn\/#website"},"datePublished":"2022-10-27T10:30:45+00:00","dateModified":"2023-02-03T03:28:52+00:00","description":"Khi mu\u1ed1n x\u00e2y d\u1ef1ng m\u1ed9t c\u00f4ng tr\u00ecnh n\u00e0o \u0111\u00f3 th\u00ec ta c\u1ea7n ph\u1ea3i qua kh\u00e2u thi\u1ebft k\u1ebf v\u00e0 th\u1ef1c hi\u1ec7n thi c\u00f4ng \u0111i\u1ec7n n\u01b0\u1edbc. trong c\u00e1c c\u00f4ng tr\u00ecnh","breadcrumb":{"@id":"https:\/\/p69.com.vn\/thi-cong-dien-nuoc-trong-cong-trinh\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/p69.com.vn\/thi-cong-dien-nuoc-trong-cong-trinh\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/p69.com.vn\/thi-cong-dien-nuoc-trong-cong-trinh\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Trang ch\u1ee7","item":"https:\/\/p69.com.vn\/"},{"@type":"ListItem","position":2,"name":"K\u1ef9 thu\u1eadt thi c\u00f4ng \u0111i\u1ec7n n\u01b0\u1edbc trong c\u00f4ng tr\u00ecnh d\u00e2n d\u1ee5ng chu\u1ea9n"}]},{"@type":"WebSite","@id":"https:\/\/p69.com.vn\/#website","url":"https:\/\/p69.com.vn\/","name":"P69","description":"C\u00f4ng ty C\u1ed5 Ph\u1ea7n \u0110\u1ea7u T\u01b0 P69","publisher":{"@id":"https:\/\/p69.com.vn\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/p69.com.vn\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/p69.com.vn\/#organization","name":"P69 - Nh\u00e0 Th\u1ea7u C\u01a1 \u0110i\u1ec7n (M&E) - C\u00f4ng ty C\u1ed5 ph\u1ea7n \u0110\u1ea7u T\u01b0 P69","url":"https:\/\/p69.com.vn\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/p69.com.vn\/#\/schema\/logo\/image\/","url":"https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/01\/log-3.png","contentUrl":"https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/01\/log-3.png","width":80,"height":89,"caption":"P69 - Nh\u00e0 Th\u1ea7u C\u01a1 \u0110i\u1ec7n (M&E) - C\u00f4ng ty C\u1ed5 ph\u1ea7n \u0110\u1ea7u T\u01b0 P69"},"image":{"@id":"https:\/\/p69.com.vn\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/p69.com.vn\/#\/schema\/person\/e7444874c2d9f2d90eb8fbc63e75243f","name":"adminhdec","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/p69.com.vn\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/6a37fb20c2a6355450f6e88f87712df2c2f3dd263b0e77cec6231c95e507f5b5?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/6a37fb20c2a6355450f6e88f87712df2c2f3dd263b0e77cec6231c95e507f5b5?s=96&d=mm&r=g","caption":"adminhdec"},"url":"https:\/\/p69.com.vn\/en\/author\/adminhdec\/"}]}},"_links":{"self":[{"href":"https:\/\/p69.com.vn\/en\/wp-json\/wp\/v2\/posts\/3302","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/p69.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/p69.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/p69.com.vn\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/p69.com.vn\/en\/wp-json\/wp\/v2\/comments?post=3302"}],"version-history":[{"count":3,"href":"https:\/\/p69.com.vn\/en\/wp-json\/wp\/v2\/posts\/3302\/revisions"}],"predecessor-version":[{"id":3763,"href":"https:\/\/p69.com.vn\/en\/wp-json\/wp\/v2\/posts\/3302\/revisions\/3763"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/p69.com.vn\/en\/wp-json\/wp\/v2\/media\/3313"}],"wp:attachment":[{"href":"https:\/\/p69.com.vn\/en\/wp-json\/wp\/v2\/media?parent=3302"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/p69.com.vn\/en\/wp-json\/wp\/v2\/categories?post=3302"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/p69.com.vn\/en\/wp-json\/wp\/v2\/tags?post=3302"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}