{"id":2662,"date":"2022-07-10T08:58:42","date_gmt":"2022-07-10T08:58:42","guid":{"rendered":"https:\/\/p69.com.vn\/?p=2662"},"modified":"2022-07-11T02:08:04","modified_gmt":"2022-07-11T02:08:04","slug":"lap-dat-ong-thoat-nuoc","status":"publish","type":"post","link":"https:\/\/p69.com.vn\/en\/lap-dat-ong-thoat-nuoc\/","title":{"rendered":"Instructions for construction and installation of apartment drainage pipes from A &#8211; Z"},"content":{"rendered":"<p>An apartment water supply system is a system that supplies water for daily life in a residential area. In contrast, the apartment drainage system is a drainage system consisting of pipes, culverts, ditches and channels in charge of treating domestic wastewater before discharging it to the source. A satisfactory water supply and drainage system will contribute to improving the quality of life of residents in that area. Let&#8217;s find out the details of the construction and <strong>installation of apartment drainage pipes<\/strong> with <a href=\"https:\/\/p69.com.vn\/en\/\">P69 Join Stock Company<\/a>!<\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_45 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\">Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" area-label=\"ez-toc-toggle-icon-1\"><label for=\"item-69e924029fc5a\" aria-label=\"Table of Content\"><span style=\"display: flex;align-items: center;width: 35px;height: 30px;justify-content: center;direction:ltr;\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/label><input  type=\"checkbox\" id=\"item-69e924029fc5a\"><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 eztoc-visibility-hide-by-default' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/p69.com.vn\/en\/lap-dat-ong-thoat-nuoc\/#What_is_the_construction_and_installation_of_apartment_drainage_pipes\" title=\"What is the construction and installation of apartment drainage pipes?\">What is the construction and installation of apartment drainage pipes?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/p69.com.vn\/en\/lap-dat-ong-thoat-nuoc\/#Effects_of_installing_water_supply_and_drainage_systems_in_apartments_and_buildings\" title=\"Effects of installing water supply and drainage systems in apartments and buildings\">Effects of installing water supply and drainage systems in apartments and buildings<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/p69.com.vn\/en\/lap-dat-ong-thoat-nuoc\/#Instructions_for_construction_and_installation_of_apartment_drainage_pipes_from_A_-_Z\" title=\"Instructions for construction and installation of apartment drainage pipes from A &#8211; Z\">Instructions for construction and installation of apartment drainage pipes from A &#8211; Z<\/a><ul class='ez-toc-list-level-3'><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/p69.com.vn\/en\/lap-dat-ong-thoat-nuoc\/#1_Positioning_the_mark\" title=\"1. Positioning the mark\">1. Positioning the mark<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/p69.com.vn\/en\/lap-dat-ong-thoat-nuoc\/#2_Installing_the_water_supply_pipe\" title=\"2. Installing the water supply pipe\">2. Installing the water supply pipe<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/p69.com.vn\/en\/lap-dat-ong-thoat-nuoc\/#3_Installing_water_supply_stand_and_pump_system\" title=\"3. Installing water supply stand and pump system\">3. Installing water supply stand and pump system<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/p69.com.vn\/en\/lap-dat-ong-thoat-nuoc\/#4_Installation_of_drainage_pipes\" title=\"4. Installation of drainage pipes\">4. Installation of drainage pipes<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/p69.com.vn\/en\/lap-dat-ong-thoat-nuoc\/#5_Install_sanitary_ware\" title=\"5. Install sanitary ware\">5. Install sanitary ware<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/p69.com.vn\/en\/lap-dat-ong-thoat-nuoc\/#6_Complete_installation\" title=\"6. Complete installation\">6. Complete installation<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/p69.com.vn\/en\/lap-dat-ong-thoat-nuoc\/#Regulations_and_notes_when_installing_drainage_pipes\" title=\"Regulations and notes when installing drainage pipes\">Regulations and notes when installing drainage pipes<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/p69.com.vn\/en\/lap-dat-ong-thoat-nuoc\/#Contact_information_P69_-_M_E_Contractor\" title=\"Contact information P69 \u2013 M&amp;E Contractor\">Contact information P69 \u2013 M&amp;E Contractor<\/a><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"What_is_the_construction_and_installation_of_apartment_drainage_pipes\"><\/span>What is the construction and installation of apartment drainage pipes?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Water supply system\u00a0high-rise apartment building is a system of tanks, pipes, industrial valve equipment (including group of protection valves &#8211; function valves opening\/closing, regulating) designed for storage. water source, supply and distribution to each apartment in a high-rise apartment building. A standard building water supply system must ensure regular and stable water supply to the apartments and water supply equipment.<\/p>\n<p>The drainage system of the apartment building includes domestic water drainage and storm water drainage. The building&#8217;s domestic drainage system requires to collect all wastewater from daily activities of the apartments in the building and must be treated. After that, wastewater will be taken to septic tanks and discharged into the environment by the urban drainage network.<\/p>\n<p>Buildings are often very tall, if rainwater is allowed to leave freely from the upper floors, it will be very dangerous. Therefore, buildings need to collect and lead close to the ground to the urban drainage network.<\/p>\n<figure id=\"attachment_2664\" aria-describedby=\"caption-attachment-2664\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-2664 size-full\" title=\"Thi c\u00f4ng l\u1eafp \u0111\u1eb7t \u1ed1ng tho\u00e1t n\u01b0\u1edbc c\u0103n h\u1ed9 l\u00e0 g\u00ec ?\" src=\"https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/07\/he-thong-cap-nuoc-chung-cu-4-min.jpg\" alt=\"Thi c\u00f4ng l\u1eafp \u0111\u1eb7t \u1ed1ng tho\u00e1t n\u01b0\u1edbc c\u0103n h\u1ed9 l\u00e0 g\u00ec ?\" width=\"800\" height=\"367\" srcset=\"https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/07\/he-thong-cap-nuoc-chung-cu-4-min.jpg 800w, https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/07\/he-thong-cap-nuoc-chung-cu-4-min-300x138.jpg 300w, https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/07\/he-thong-cap-nuoc-chung-cu-4-min-768x352.jpg 768w, https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/07\/he-thong-cap-nuoc-chung-cu-4-min-600x275.jpg 600w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-2664\" class=\"wp-caption-text\"><em>What is the construction and installation of apartment drainage pipes?<\/em><\/figcaption><\/figure>\n<h2><span class=\"ez-toc-section\" id=\"Effects_of_installing_water_supply_and_drainage_systems_in_apartments_and_buildings\"><\/span>Effects of installing water supply and drainage systems in apartments and buildings<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Water plays a very important role in human life, partly determining the quality of life of people in that area. Therefore, if you want to provide a water source to meet the needs of the people in the apartment building, the building needs a fully functional water supply and drainage system.<\/p>\n<p>A satisfactory apartment water supply system is a system that provides adequate domestic water for residents at all locations in the apartment or building. The water supply and drainage system, in addition to providing adequate water for the apartment building, need to ensure that the discharge of domestic water is not blocked, the pipeline always ensures the drainage of domestic water and wastewater in a timely manner.<\/p>\n<figure id=\"attachment_2667\" aria-describedby=\"caption-attachment-2667\" style=\"width: 2048px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-2667 size-full\" title=\"T\u00e1c d\u1ee5ng c\u1ee7a l\u1eafp \u0111\u1eb7t h\u1ec7 th\u1ed1ng c\u1ea5p tho\u00e1t n\u01b0\u1edbc trong chung c\u01b0, t\u00f2a nh\u00e0\" src=\"https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/07\/thiet_ke_lap_dat_he_thong_cap_thoat_nuoc_toa_nha_00_e7fa8a388bbb4f24aaf1e725b1e30140_master.webp\" alt=\"T\u00e1c d\u1ee5ng c\u1ee7a l\u1eafp \u0111\u1eb7t h\u1ec7 th\u1ed1ng c\u1ea5p tho\u00e1t n\u01b0\u1edbc trong chung c\u01b0, t\u00f2a nh\u00e0\" width=\"2048\" height=\"1536\" srcset=\"https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/07\/thiet_ke_lap_dat_he_thong_cap_thoat_nuoc_toa_nha_00_e7fa8a388bbb4f24aaf1e725b1e30140_master.webp 2048w, https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/07\/thiet_ke_lap_dat_he_thong_cap_thoat_nuoc_toa_nha_00_e7fa8a388bbb4f24aaf1e725b1e30140_master-300x225.webp 300w, https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/07\/thiet_ke_lap_dat_he_thong_cap_thoat_nuoc_toa_nha_00_e7fa8a388bbb4f24aaf1e725b1e30140_master-1024x768.webp 1024w, https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/07\/thiet_ke_lap_dat_he_thong_cap_thoat_nuoc_toa_nha_00_e7fa8a388bbb4f24aaf1e725b1e30140_master-768x576.webp 768w, https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/07\/thiet_ke_lap_dat_he_thong_cap_thoat_nuoc_toa_nha_00_e7fa8a388bbb4f24aaf1e725b1e30140_master-1536x1152.webp 1536w, https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/07\/thiet_ke_lap_dat_he_thong_cap_thoat_nuoc_toa_nha_00_e7fa8a388bbb4f24aaf1e725b1e30140_master-600x450.webp 600w\" sizes=\"auto, (max-width: 2048px) 100vw, 2048px\" \/><figcaption id=\"caption-attachment-2667\" class=\"wp-caption-text\"><em>Effects of installing water supply and drainage systems in apartments and buildings<\/em><\/figcaption><\/figure>\n<h2 id=\"hmenuid4\"><span class=\"ez-toc-section\" id=\"Instructions_for_construction_and_installation_of_apartment_drainage_pipes_from_A_-_Z\"><\/span>Instructions for construction and installation of apartment drainage pipes from A &#8211; Z<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Instructions for <a href=\"https:\/\/p69.com.vn\/en\/lap-dat-ong-thoat-nuoc\/\" target=\"_blank\" rel=\"noopener\"><strong>Installing drainage pipes<\/strong><\/a> for apartments include the following steps:<\/p>\n<h3 id=\"hmenuid5\"><span class=\"ez-toc-section\" id=\"1_Positioning_the_mark\"><\/span>1. Positioning the mark<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Before proceeding with the construction, you need to make an impression and determine the location to install the equipment along with the pipeline. Underground pipes will be marked according to their position from the floor. For example, the installation of pipes for water heaters will be calculated as follows:<\/p>\n<ul>\n<li><em>Hot water tank head position: +1.75m<\/em><\/li>\n<li><em>Pipes: +1.0m<\/em><\/li>\n<li><em>Cold water pipe: +0.52m<\/em><\/li>\n<li><em>Hot water waiting head:\u00a0+1.8m<\/em><\/li>\n<\/ul>\n<h3 id=\"hmenuid6\"><span class=\"ez-toc-section\" id=\"2_Installing_the_water_supply_pipe\"><\/span>2. Installing the water supply pipe<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>When starting construction, factors such as materials, joints, types of pipes, drilling positions must meet the technical requirements. At the same time, when using machines such as welding machines and cutting machines, it is necessary to pay attention to not endangering yourself.<\/p>\n<p>After the installation is complete, you need to conduct a pipe water pressure test to test. You put the highest water pressure on the pipe for about 15 minutes. Then, conduct operational monitoring to find leak locations (if any). After finishing, you put cement to fix.<\/p>\n<h3 id=\"hmenuid7\"><span class=\"ez-toc-section\" id=\"3_Installing_water_supply_stand_and_pump_system\"><\/span>3. Installing water supply stand and pump system<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Depending on the size of the vertical column, you choose the appropriate connection method. For cylinders about <strong>D50<\/strong> or less, the thread method is recommended. Pipes \u00a0D50 and above should use the welding method.<\/p>\n<p>Must ensure that the connecting threads on the bridge are sealed, anti-rust paint to increase durability. It is necessary to fix the vertical pipes with brackets and the distance from the wall to the mount is <strong>1.6m<\/strong>. Finally, proceed to pump water with high pressure to test the pressure of the pipeline.<\/p>\n<h3 id=\"hmenuid8\"><span class=\"ez-toc-section\" id=\"4_Installation_of_drainage_pipes\"><\/span>4. Installation of drainage pipes<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>The bottom-up mounting method is the most common method of <a href=\"https:\/\/p69.com.vn\/en\/lap-dat-ong-thoat-nuoc\/\" target=\"_blank\" rel=\"noopener\"><strong>Installing drainage pipes<\/strong><\/a>. Normally, pipes with diameters from <strong>100 &#8211; 350<\/strong> are used depending on the terrain, as well as the needs of users. Then, conduct the connection, apply special glue to the surface of the pipe and keep it for <strong>3 &#8211; 5 seconds<\/strong>.<\/p>\n<p>Finally, you proceed to waterproof to protect the durability of the building. Use cement together with other types of waterproofing applied directly to the floor penetration errors that need waterproofing. Leave it on for<strong> 24 hours<\/strong>, if water seeps into the system with no sign of it, you&#8217;re done.<\/p>\n<h3 id=\"hmenuid9\"><span class=\"ez-toc-section\" id=\"5_Install_sanitary_ware\"><\/span>5. Install sanitary ware<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Currently, sanitary installation equipment is usually made of ceramic, so it is easy to damage if hit hard. To ensure the safety and durability of the device, you should perform the installation when the paving and cladding stages of the house have been completed.<\/p>\n<p>From previously installed pipes, you connect equipment and pipes directly with gaskets. At the same time, you proceed to firmly fix the sanitary equipment (can use stainless steel or galvanized steel hatches). Once done, you turn on the water and survey the device&#8217;s ability to drain and water pressure.<\/p>\n<h3 id=\"hmenuid10\"><span class=\"ez-toc-section\" id=\"6_Complete_installation\"><\/span>6. Complete installation<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>After completing all the installation and inspection stages, you proceed to clean and sanitize, make sure the work is clean and neat.<\/p>\n<figure id=\"attachment_2666\" aria-describedby=\"caption-attachment-2666\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-2666 size-full\" title=\"H\u01b0\u1edbng d\u1eabn thi c\u00f4ng l\u1eafp \u0111\u1eb7t \u1ed1ng tho\u00e1t n\u01b0\u1edbc c\u0103n h\u1ed9 t\u1eeb A - Z\" src=\"https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/07\/cap-nuoc-cho-chung-cu.png\" alt=\"H\u01b0\u1edbng d\u1eabn thi c\u00f4ng l\u1eafp \u0111\u1eb7t \u1ed1ng tho\u00e1t n\u01b0\u1edbc c\u0103n h\u1ed9 t\u1eeb A - Z\" width=\"800\" height=\"422\" srcset=\"https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/07\/cap-nuoc-cho-chung-cu.png 800w, https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/07\/cap-nuoc-cho-chung-cu-300x158.png 300w, https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/07\/cap-nuoc-cho-chung-cu-768x405.png 768w, https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/07\/cap-nuoc-cho-chung-cu-600x317.png 600w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-2666\" class=\"wp-caption-text\"><em>Instructions for construction and installation of apartment drainage pipes from A &#8211; Z<\/em><\/figcaption><\/figure>\n<h2 id=\"hmenuid12\"><span class=\"ez-toc-section\" id=\"Regulations_and_notes_when_installing_drainage_pipes\"><\/span>Regulations and notes when installing drainage pipes<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><strong>Regulations on pipe sizes:<\/strong><\/p>\n<ul>\n<li><strong>Water supply pipe:<\/strong> The airline of the main water supply pipe is at least 20mm. The minimum branch water pipes are 13 mm.<\/li>\n<li><strong>Drain pipe:<\/strong> The main drain pipe must be larger than 102 mm. Horizontal exit of the floor, toilet is larger than 78 mm. Water tanks, bathtubs, toilets larger than 38 mm.<\/li>\n<li><strong>Ventilation tube:<\/strong>\u00a0Main tube (straight to the sky) is larger than 78 mm, other ventilation ducts are larger than 38 mm.<\/li>\n<\/ul>\n<p><strong>Regulations on pipe materials and equipment:<\/strong><\/p>\n<ul>\n<li>Sewage pipes you should use PVC pipes or horizontal pipes.<\/li>\n<li>Water pipes for domestic use should use PPR plastic pipes, copper pipes, ..<\/li>\n<\/ul>\n<figure id=\"attachment_2665\" aria-describedby=\"caption-attachment-2665\" style=\"width: 1022px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-2665 size-full\" title=\"C\u00e1c quy \u0111\u1ecbnh v\u00e0 l\u01b0u \u00fd khi l\u1eafp \u0111\u1eb7t \u1ed1ng tho\u00e1t n\u01b0\u1edbc\" src=\"https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/07\/he-thong-cap-thoat-nuoc-cua-toa-nha-chung-cu.jpg\" alt=\"C\u00e1c quy \u0111\u1ecbnh v\u00e0 l\u01b0u \u00fd khi l\u1eafp \u0111\u1eb7t \u1ed1ng tho\u00e1t n\u01b0\u1edbc\" width=\"1022\" height=\"565\" srcset=\"https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/07\/he-thong-cap-thoat-nuoc-cua-toa-nha-chung-cu.jpg 1022w, https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/07\/he-thong-cap-thoat-nuoc-cua-toa-nha-chung-cu-300x166.jpg 300w, https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/07\/he-thong-cap-thoat-nuoc-cua-toa-nha-chung-cu-768x425.jpg 768w, https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/07\/he-thong-cap-thoat-nuoc-cua-toa-nha-chung-cu-600x332.jpg 600w\" sizes=\"auto, (max-width: 1022px) 100vw, 1022px\" \/><figcaption id=\"caption-attachment-2665\" class=\"wp-caption-text\"><em>Regulations and notes when installing drainage pipes<\/em><\/figcaption><\/figure>\n<p>Contact us today for a free consultation and answer at:<\/p>\n<div dir=\"auto\">\n<h2><span class=\"ez-toc-section\" id=\"Contact_information_P69_-_M_E_Contractor\"><\/span>Contact information P69 \u2013 M&amp;E Contractor<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Address: No. 6\/165C Xuan Thuy, Cau Giay District, Hanoi<\/p>\n<p>Website: https:\/\/p69.com.vn\/<\/p>\n<p>Hotline: 02437688156 \u2013 0965937799<\/p>\n<p>Email: kd@cokhip69.com.vn<\/p>\n<p>Facebook:\u00a0<a href=\"https:\/\/www.facebook.com\/p69nhathaucodien\">https:\/\/www.facebook.com\/p69nhathaucodien<\/a><\/p>\n<p>LinkedIn:\u00a0<a href=\"https:\/\/www.linkedin.com\/in\/congtyp69\/\">https:\/\/www.linkedin.com\/in\/congtyp69\/<\/a><\/p>\n<p>Youtube :\u00a0<a href=\"https:\/\/www.youtube.com\/channel\/UCOUwCnE5iGj8iqe_ZIUM7oA\">https:\/\/www.youtube.com\/channel\/UCOUwCnE5iGj8iqe_ZIUM7oA<\/a><\/p>\n<\/div>\n<p><\/p>\n\n\n<div class=\"kk-star-ratings kksr-auto kksr-align-left kksr-valign-bottom\"\n    data-payload='{&quot;align&quot;:&quot;left&quot;,&quot;id&quot;:&quot;2662&quot;,&quot;slug&quot;:&quot;default&quot;,&quot;valign&quot;:&quot;bottom&quot;,&quot;ignore&quot;:&quot;&quot;,&quot;reference&quot;:&quot;auto&quot;,&quot;class&quot;:&quot;&quot;,&quot;count&quot;:&quot;1&quot;,&quot;legendonly&quot;:&quot;&quot;,&quot;readonly&quot;:&quot;&quot;,&quot;score&quot;:&quot;5&quot;,&quot;starsonly&quot;:&quot;&quot;,&quot;best&quot;:&quot;5&quot;,&quot;gap&quot;:&quot;5&quot;,&quot;greet&quot;:&quot;Rate this post&quot;,&quot;legend&quot;:&quot;5\\\/5 - (1 vote)&quot;,&quot;size&quot;:&quot;24&quot;,&quot;width&quot;:&quot;142.5&quot;,&quot;_legend&quot;:&quot;{score}\\\/{best} - ({count} {votes})&quot;,&quot;font_factor&quot;:&quot;1.25&quot;}'>\n            \n<div class=\"kksr-stars\">\n    \n<div class=\"kksr-stars-inactive\">\n            <div class=\"kksr-star\" data-star=\"1\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"2\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"3\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"4\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"5\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n    <\/div>\n    \n<div class=\"kksr-stars-active\" style=\"width: 142.5px;\">\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n    <\/div>\n<\/div>\n                \n\n<div class=\"kksr-legend\" style=\"font-size: 19.2px;\">\n            5\/5 - (1 vote)    <\/div>\n    <\/div>","protected":false},"excerpt":{"rendered":"<p>An apartment water supply system is a system that supplies water for daily life in a residential area. In contrast, the apartment drainage system is a drainage system consisting of pipes, culverts, ditches and channels in charge of treating domestic wastewater before discharging it to the source. A satisfactory water supply and drainage system will [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":2667,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[24],"tags":[],"class_list":["post-2662","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tin-tuc"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v17.1.1 (Yoast SEO v20.0) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>H\u01b0\u1edbng d\u1eabn thi c\u00f4ng l\u1eafp \u0111\u1eb7t \u1ed1ng tho\u00e1t n\u01b0\u1edbc c\u0103n h\u1ed9 t\u1eeb A - Z<\/title>\n<meta name=\"description\" content=\"L\u1eafp \u0111\u1eb7t \u1ed1ng tho\u00e1t n\u01b0\u1edbc cho c\u0103n h\u1ed9 l\u00e0 l\u1eafp \u0111\u1eb7t h\u1ec7 th\u1ed1ng cung c\u1ea5p n\u01b0\u1edbc cho \u0111\u1eddi s\u1ed1ng sinh ho\u1ea1t trong khu d\u00e2n c\u01b0.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/p69.com.vn\/lap-dat-ong-thoat-nuoc\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"[:vi]H\u01b0\u1edbng d\u1eabn thi c\u00f4ng l\u1eafp \u0111\u1eb7t \u1ed1ng tho\u00e1t n\u01b0\u1edbc c\u0103n h\u1ed9 t\u1eeb A - Z[:en]Instructions for construction and installation of apartment drainage pipes from A - Z[:]\" \/>\n<meta property=\"og:description\" content=\"L\u1eafp \u0111\u1eb7t \u1ed1ng tho\u00e1t n\u01b0\u1edbc cho c\u0103n h\u1ed9 l\u00e0 l\u1eafp \u0111\u1eb7t h\u1ec7 th\u1ed1ng cung c\u1ea5p n\u01b0\u1edbc cho \u0111\u1eddi s\u1ed1ng sinh ho\u1ea1t trong khu d\u00e2n c\u01b0.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/p69.com.vn\/lap-dat-ong-thoat-nuoc\/\" \/>\n<meta property=\"og:site_name\" content=\"P69\" \/>\n<meta property=\"article:published_time\" content=\"2022-07-10T08:58:42+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-07-11T02:08:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/07\/thiet_ke_lap_dat_he_thong_cap_thoat_nuoc_toa_nha_00_e7fa8a388bbb4f24aaf1e725b1e30140_master.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1536\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"adminhdec\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"adminhdec\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/p69.com.vn\/lap-dat-ong-thoat-nuoc\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/p69.com.vn\/lap-dat-ong-thoat-nuoc\/\"},\"author\":{\"name\":\"adminhdec\",\"@id\":\"https:\/\/p69.com.vn\/#\/schema\/person\/e7444874c2d9f2d90eb8fbc63e75243f\"},\"headline\":\"Instructions for construction and installation of apartment drainage pipes from A &#8211; Z\",\"datePublished\":\"2022-07-10T08:58:42+00:00\",\"dateModified\":\"2022-07-11T02:08:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/p69.com.vn\/lap-dat-ong-thoat-nuoc\/\"},\"wordCount\":3262,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/p69.com.vn\/#organization\"},\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/p69.com.vn\/lap-dat-ong-thoat-nuoc\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/p69.com.vn\/lap-dat-ong-thoat-nuoc\/\",\"url\":\"https:\/\/p69.com.vn\/lap-dat-ong-thoat-nuoc\/\",\"name\":\"H\u01b0\u1edbng d\u1eabn thi c\u00f4ng l\u1eafp \u0111\u1eb7t \u1ed1ng tho\u00e1t n\u01b0\u1edbc c\u0103n h\u1ed9 t\u1eeb A - Z\",\"isPartOf\":{\"@id\":\"https:\/\/p69.com.vn\/#website\"},\"datePublished\":\"2022-07-10T08:58:42+00:00\",\"dateModified\":\"2022-07-11T02:08:04+00:00\",\"description\":\"L\u1eafp \u0111\u1eb7t \u1ed1ng tho\u00e1t n\u01b0\u1edbc cho c\u0103n h\u1ed9 l\u00e0 l\u1eafp \u0111\u1eb7t h\u1ec7 th\u1ed1ng cung c\u1ea5p n\u01b0\u1edbc cho \u0111\u1eddi s\u1ed1ng sinh ho\u1ea1t trong khu d\u00e2n c\u01b0.\",\"breadcrumb\":{\"@id\":\"https:\/\/p69.com.vn\/lap-dat-ong-thoat-nuoc\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/p69.com.vn\/lap-dat-ong-thoat-nuoc\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/p69.com.vn\/lap-dat-ong-thoat-nuoc\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Trang ch\u1ee7\",\"item\":\"https:\/\/p69.com.vn\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"H\u01b0\u1edbng d\u1eabn thi c\u00f4ng l\u1eafp \u0111\u1eb7t \u1ed1ng tho\u00e1t n\u01b0\u1edbc c\u0103n h\u1ed9 t\u1eeb A &#8211; Z\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/p69.com.vn\/#website\",\"url\":\"https:\/\/p69.com.vn\/\",\"name\":\"P69\",\"description\":\"C\u00f4ng ty C\u1ed5 Ph\u1ea7n \u0110\u1ea7u T\u01b0 P69\",\"publisher\":{\"@id\":\"https:\/\/p69.com.vn\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/p69.com.vn\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/p69.com.vn\/#organization\",\"name\":\"P69 - Nh\u00e0 Th\u1ea7u C\u01a1 \u0110i\u1ec7n (M&E) - C\u00f4ng ty C\u1ed5 ph\u1ea7n \u0110\u1ea7u T\u01b0 P69\",\"url\":\"https:\/\/p69.com.vn\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/p69.com.vn\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/01\/log-3.png\",\"contentUrl\":\"https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/01\/log-3.png\",\"width\":80,\"height\":89,\"caption\":\"P69 - Nh\u00e0 Th\u1ea7u C\u01a1 \u0110i\u1ec7n (M&E) - C\u00f4ng ty C\u1ed5 ph\u1ea7n \u0110\u1ea7u T\u01b0 P69\"},\"image\":{\"@id\":\"https:\/\/p69.com.vn\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/p69.com.vn\/#\/schema\/person\/e7444874c2d9f2d90eb8fbc63e75243f\",\"name\":\"adminhdec\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/p69.com.vn\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/6a37fb20c2a6355450f6e88f87712df2c2f3dd263b0e77cec6231c95e507f5b5?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/6a37fb20c2a6355450f6e88f87712df2c2f3dd263b0e77cec6231c95e507f5b5?s=96&d=mm&r=g\",\"caption\":\"adminhdec\"},\"url\":\"https:\/\/p69.com.vn\/en\/author\/adminhdec\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"H\u01b0\u1edbng d\u1eabn thi c\u00f4ng l\u1eafp \u0111\u1eb7t \u1ed1ng tho\u00e1t n\u01b0\u1edbc c\u0103n h\u1ed9 t\u1eeb A - Z","description":"L\u1eafp \u0111\u1eb7t \u1ed1ng tho\u00e1t n\u01b0\u1edbc cho c\u0103n h\u1ed9 l\u00e0 l\u1eafp \u0111\u1eb7t h\u1ec7 th\u1ed1ng cung c\u1ea5p n\u01b0\u1edbc cho \u0111\u1eddi s\u1ed1ng sinh ho\u1ea1t trong khu d\u00e2n c\u01b0.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/p69.com.vn\/lap-dat-ong-thoat-nuoc\/","og_locale":"en_US","og_type":"article","og_title":"[:vi]H\u01b0\u1edbng d\u1eabn thi c\u00f4ng l\u1eafp \u0111\u1eb7t \u1ed1ng tho\u00e1t n\u01b0\u1edbc c\u0103n h\u1ed9 t\u1eeb A - Z[:en]Instructions for construction and installation of apartment drainage pipes from A - Z[:]","og_description":"L\u1eafp \u0111\u1eb7t \u1ed1ng tho\u00e1t n\u01b0\u1edbc cho c\u0103n h\u1ed9 l\u00e0 l\u1eafp \u0111\u1eb7t h\u1ec7 th\u1ed1ng cung c\u1ea5p n\u01b0\u1edbc cho \u0111\u1eddi s\u1ed1ng sinh ho\u1ea1t trong khu d\u00e2n c\u01b0.","og_url":"https:\/\/p69.com.vn\/lap-dat-ong-thoat-nuoc\/","og_site_name":"P69","article_published_time":"2022-07-10T08:58:42+00:00","article_modified_time":"2022-07-11T02:08:04+00:00","og_image":[{"width":2048,"height":1536,"url":"https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/07\/thiet_ke_lap_dat_he_thong_cap_thoat_nuoc_toa_nha_00_e7fa8a388bbb4f24aaf1e725b1e30140_master.webp","type":"image\/webp"}],"author":"adminhdec","twitter_card":"summary_large_image","twitter_misc":{"Written by":"adminhdec","Est. reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/p69.com.vn\/lap-dat-ong-thoat-nuoc\/#article","isPartOf":{"@id":"https:\/\/p69.com.vn\/lap-dat-ong-thoat-nuoc\/"},"author":{"name":"adminhdec","@id":"https:\/\/p69.com.vn\/#\/schema\/person\/e7444874c2d9f2d90eb8fbc63e75243f"},"headline":"Instructions for construction and installation of apartment drainage pipes from A &#8211; Z","datePublished":"2022-07-10T08:58:42+00:00","dateModified":"2022-07-11T02:08:04+00:00","mainEntityOfPage":{"@id":"https:\/\/p69.com.vn\/lap-dat-ong-thoat-nuoc\/"},"wordCount":3262,"commentCount":0,"publisher":{"@id":"https:\/\/p69.com.vn\/#organization"},"articleSection":["News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/p69.com.vn\/lap-dat-ong-thoat-nuoc\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/p69.com.vn\/lap-dat-ong-thoat-nuoc\/","url":"https:\/\/p69.com.vn\/lap-dat-ong-thoat-nuoc\/","name":"H\u01b0\u1edbng d\u1eabn thi c\u00f4ng l\u1eafp \u0111\u1eb7t \u1ed1ng tho\u00e1t n\u01b0\u1edbc c\u0103n h\u1ed9 t\u1eeb A - Z","isPartOf":{"@id":"https:\/\/p69.com.vn\/#website"},"datePublished":"2022-07-10T08:58:42+00:00","dateModified":"2022-07-11T02:08:04+00:00","description":"L\u1eafp \u0111\u1eb7t \u1ed1ng tho\u00e1t n\u01b0\u1edbc cho c\u0103n h\u1ed9 l\u00e0 l\u1eafp \u0111\u1eb7t h\u1ec7 th\u1ed1ng cung c\u1ea5p n\u01b0\u1edbc cho \u0111\u1eddi s\u1ed1ng sinh ho\u1ea1t trong khu d\u00e2n c\u01b0.","breadcrumb":{"@id":"https:\/\/p69.com.vn\/lap-dat-ong-thoat-nuoc\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/p69.com.vn\/lap-dat-ong-thoat-nuoc\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/p69.com.vn\/lap-dat-ong-thoat-nuoc\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Trang ch\u1ee7","item":"https:\/\/p69.com.vn\/"},{"@type":"ListItem","position":2,"name":"H\u01b0\u1edbng d\u1eabn thi c\u00f4ng l\u1eafp \u0111\u1eb7t \u1ed1ng tho\u00e1t n\u01b0\u1edbc c\u0103n h\u1ed9 t\u1eeb A &#8211; Z"}]},{"@type":"WebSite","@id":"https:\/\/p69.com.vn\/#website","url":"https:\/\/p69.com.vn\/","name":"P69","description":"C\u00f4ng ty C\u1ed5 Ph\u1ea7n \u0110\u1ea7u T\u01b0 P69","publisher":{"@id":"https:\/\/p69.com.vn\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/p69.com.vn\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/p69.com.vn\/#organization","name":"P69 - Nh\u00e0 Th\u1ea7u C\u01a1 \u0110i\u1ec7n (M&E) - C\u00f4ng ty C\u1ed5 ph\u1ea7n \u0110\u1ea7u T\u01b0 P69","url":"https:\/\/p69.com.vn\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/p69.com.vn\/#\/schema\/logo\/image\/","url":"https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/01\/log-3.png","contentUrl":"https:\/\/p69.com.vn\/wp-content\/uploads\/2022\/01\/log-3.png","width":80,"height":89,"caption":"P69 - Nh\u00e0 Th\u1ea7u C\u01a1 \u0110i\u1ec7n (M&E) - C\u00f4ng ty C\u1ed5 ph\u1ea7n \u0110\u1ea7u T\u01b0 P69"},"image":{"@id":"https:\/\/p69.com.vn\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/p69.com.vn\/#\/schema\/person\/e7444874c2d9f2d90eb8fbc63e75243f","name":"adminhdec","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/p69.com.vn\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/6a37fb20c2a6355450f6e88f87712df2c2f3dd263b0e77cec6231c95e507f5b5?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/6a37fb20c2a6355450f6e88f87712df2c2f3dd263b0e77cec6231c95e507f5b5?s=96&d=mm&r=g","caption":"adminhdec"},"url":"https:\/\/p69.com.vn\/en\/author\/adminhdec\/"}]}},"_links":{"self":[{"href":"https:\/\/p69.com.vn\/en\/wp-json\/wp\/v2\/posts\/2662","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/p69.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/p69.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/p69.com.vn\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/p69.com.vn\/en\/wp-json\/wp\/v2\/comments?post=2662"}],"version-history":[{"count":5,"href":"https:\/\/p69.com.vn\/en\/wp-json\/wp\/v2\/posts\/2662\/revisions"}],"predecessor-version":[{"id":2701,"href":"https:\/\/p69.com.vn\/en\/wp-json\/wp\/v2\/posts\/2662\/revisions\/2701"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/p69.com.vn\/en\/wp-json\/wp\/v2\/media\/2667"}],"wp:attachment":[{"href":"https:\/\/p69.com.vn\/en\/wp-json\/wp\/v2\/media?parent=2662"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/p69.com.vn\/en\/wp-json\/wp\/v2\/categories?post=2662"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/p69.com.vn\/en\/wp-json\/wp\/v2\/tags?post=2662"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}